Thursday, September 11, 2008

Glamor Raya the montage

After the logo approved, I have to do the montage for the programme.



After Effects.



The design







The end logo

Duration : 30 secs

Time Taken : 3 days X 8 hrs.

Thursday, September 04, 2008

3D Character

This is a 3D character of Eric Leong, host of the show, "Deko Bersama Eric", 3D modelling was done in XSi. Head was model from the model that XSi have, shirt was done with cube, extruded and smooth.

Skeleton was taken from netview in XSi and was enveloped to the model. The model was done in 1 day, shirt and body in 4 hours and rigging in 1 day.

It was not animated yet.




The head was model from a head that was in Softimage XSi.



Shirt was model from a cube, extruded and smooth.



hands and shoes was added later.



Skeleton biped was taken from netview in XSi, and fitted to the model.



A preview rendering of the model.

Nice Flower



This flower was taken in Kuala Kerang, while I was going to the most southern tip of the Asia continent. Got a few busy bees hovering over it.